news

Basic construction structure of Zhenshen foam glass exterior insulation

Editor:Zhejiang Zhenshen Insulation Technology Corp. Ltd. │ Release Time:2019-01-24 

 When pasting, according to the characteristics of the foam glass insulation system material, it is advisable to use a toothed trowel to apply the disposed foam glass bonding mortar to the base wall and the foam glass, and then firmly adhere the foam glass to the base wall. On the surface, at the anchor reinforcement position, the docking is performed with foam glass. When using anti-cracking mortar leveling construction, the flatness deviation should not exceed ±4mm, it should not be too thick, mainly for leveling, the thickness of plaster should be slightly higher than the thickness of the standard rib, and then scraped with a ruler. The trowel is partially repaired and flattened; after the surface layer is found to be wiped for 30 minutes, the wall surface is smeared with a trowel, and the construction of the crack-resistant layer and the facing layer can be carried out after the acceptance of the line ruler reaches the acceptance standard. Foam glass should also be attached to the door and window openings to block the heat bridge and improve the insulation effect of the building.

  For the building with the facing layer as the tile, the foam glass system technology emphasizes the use of nails or anchor bolts to connect with the base layer, and the four-angle steel wire mesh is bundled with the tail wire anchored wire. When the four-angle wire mesh bundle is uneven, it must be pressed with steel nails. Thin iron sheet, the steel mesh is fixed on the foam glass to ensure the smooth construction of the subsequent process of the wire mesh bundling. Through the reinforcement measures such as nailing, expansion bolts, galvanized steel wire and four-corner mesh, the effect of the brick load on the surface layer can be transmitted to the stable base wall, which acts as an isolation protection for the insulation layer and also enhances the protection. The insulation layer and the cement cracking mortar have good gripping force, and the tensile layer is subjected to the tensile force from the horizontal direction and the vertical direction, thereby greatly improving the strength of the surface layer of the tile, and further ensuring the earthquake resistance and wind resistance of the heat preservation system. Pressure capacity.

  Foam glass exterior insulation technology has been well applied in many major projects in Beijing and Tianjin, and has accumulated rich experience. Make full use of its own technical advantages and application experience to guide the design and construction of such current technical systems in China. Insulated foam glass for installation is suitable for thermal equipment, pipes, containers and refrigerators. The products are made into plates, blocks, slabs or arches.

  This material can be used in the temperature range of -260~+500 °C. The use of foam glass for thermal insulation varies in different temperature ranges.

  (1)The construction method when the temperature is higher than 100 °C is generally fixed by wire or metal strip, or fixed by bolts or angle irons, or bonded with high temperature adhesive. If a paste such as water glass is used, it is necessary to perform point bonding, and the joint may be made of tar epoxy filler or clay mud.

  When used as an external material, foam glass products with good airtightness and flame retardancy and climate adaptability should be selected. The construction methods are as follows.:

  ① Wrapped in oil felt or glass cloth, covered with iron;

  ② Coated with mastic, wrapped in glass cloth, and then coated with mastic;

  ③ Applying concrete;

  ④ Covered with asbestos;

  (2) When the temperature is lower than -30 °C, the construction method is between -30 °C and -70 °C. In addition to the dense assembly with the foam sealing material, a metal strip must be tied every 230 mm to fix it; At 70 ° C, generally no binder is used, but a multi-layer assembly of layers or more is used, and from the second layer, the filler is filled with a filler. Then tie the band and apply the exposed layer to the low temperature mastic。

主站蜘蛛池模板: 天天干 夜夜操 | 91久久久久久久一区二区 | 在线亚洲成人 | 国产精品一区二区久久久久 | 欧美成人精品一区二区男人看 | 超碰97最新| 成人毛片在线播放 | 日本视频在线 | 中文字幕一区二区精品区 | a级毛片高清免费视频 | 高清一区二区三区 | 九九影院理论片 | 国产高清在线精品 | 夜夜爽爽 | 亚洲 欧洲 偷拍 校园 另类 | 男人天堂中文字幕 | 新神奇四侠免费完整版在线观看 | 成av在线| 成人自拍偷拍视频 | 成人免费大片a毛片 | 在线观看高清免费 | 我和我的祖国电影在线观看免费版高清 | 色狠狠色狠狠综合天天 | 一级片视频免费观看 | 免费在线一级毛片 | 亚洲国产专区 | 人人爽久久涩噜噜噜蜜桃 | 国产精品久久久久久久7电影 | 久久精品国内一区二区三区 | 99热热精品 | 天天色官网| 亚洲日本片 | 激情五月综合 | 日韩在线免费视频 | 精品国产成a人在线观看 | 久草在线视频在线 | 欧美伦交 | 精品一区二区三区四区 | 亚洲片在线观看 | 涩涩色中文综合亚洲 | 国产精品一二三区 |